Call Us

Steel Making Furnaces

Offered array of Steel Making Furnaces has been developed by competent technocrats by using best grade raw materials. Mechanism and application of these furnaces depend on their design. Usually metal bath and carbon electrodes are used to produce electric arcs during steel making process. Advanced deoxidization technology is used to treat metal in these furnaces. Quality of these Steel Making Furnaces has been verified on the basis of their production rate, performance, design, operating mode, emission rate, working life and handling technique. Low operation cost, low labor charge, simple installation process, energy efficient functioning and ergonomic design are the main attributes of these furnaces.
Product Image (100)

Titanium bearing pellets

Price: 120 USD ($)/Ton

TiO2> 25%

Product Image (50)

Short Net

Price: 5000 USD ($)
  • Delivery Time:45 Days
  • Supply Ability:3000 Per Year
Product Image (10)

Water-cooled Compensator

Price: 100 USD ($)
  • Delivery Time:25 Days
  • Supply Ability:30000 Per Year
  • Usage:for EAF
  • Product Type:brass
  • Color:yellow
  • Weight:as per size
Product Image (65)

Water Cooled Lid

Price: 30000 USD ($)
  • Delivery Time:30 Days
  • Supply Ability:3000 set Per Year
Product Image (63)

Oxygen Lance tip

Price: 50 USD ($)
  • Delivery Time:30 Days
  • Supply Ability:3000 Per Year
Product Image (06-1)

Electric Arc Furnace

Price: 10000 USD ($)/Box
  • Supply Ability:2500 Per Month
  • Delivery Time:45 Days
Product Image (62)

Ladle Refining Furnace (LF)

Price: 10000 USD ($)
  • Delivery Time:45 Days
Product Image (06-6)

Water Cooled Cable

Price: 100 USD ($)
  • Delivery Time:45 Days
Product Image (67)

Graphite Electrode Conductive Arm

Price: 5000 USD ($)
  • Condition:New
  • Usage:Melting Furnace
  • Delivery Time:45 Days
Product Image (66)

Graphite electrode Holder

Price: 5000 USD ($)
  • Delivery Time:45 Days
  • Supply Ability:3000 pcs Per Year
Product Image (68)

Ladle Heater Burner

Price: 5000 USD ($)
  • Delivery Time:30 Days
  • Supply Ability:3000 Per Year
Product Image (69)

Ladle Preheater

Price: 100000 USD ($)/Set
  • Delivery Time:60 Days
  • Supply Ability:3000 Per Year
  • Vehicle Type:Horizontal and vertical
Product Image (64)

EAF Lid

Price: 3000 USD ($)/Box
  • Delivery Time:30 Days
  • Supply Ability:2200 Per Month
X


Back to top
AMK METALLURGICAL MACHINERY GROUP CO., LTD. All Rights Reserved.(Terms of Use)
Developed and Managed by Infocom Network Ltd.